Saturday 18 and Sunday 19 May 2024

  • Seafield Road (Stanley Road to Seafield Terrace)

    closed Saturday 18 and Sunday 19 May for BT work.

  • Davidson Street (50m either side of Seafield Road)

    closed Saturday 18 and Sunday 19 May for BT work.

Report For Week Commencing Monday 20 May 2024

  • Blinshall Street (Douglas Street to 50 metres south)

    closed until December 2024 for construction works.

  • Douglas Street (Blinshall Street to Brown Street)

    temporary traffic lights until June 2024 for construction works.

  • Brown Street (south of Douglas Street)

    closed until December 2024 for construction works.

  • Seafield Road, Dundee

    closed from its westmost end (in cul-de-sac) extending for a distance of no more than 20 metres in an easterly direction to facilitate a site access for a new housing development until November 2025.

  • Constitution Road (from its junction with Bell Street to North Marketgait)

    closed until September 2025 for redevelopment of multi‑storey car park and adjoining areas.

  • Earl Grey Place West (South Crichton Street west for 50m)

    closed until March 2025 for facilitating construction works.

  • Tay Road Bridge

    major roadworks commences on Monday 4 March for 6 months.  Southbound carriageway will be closed, and all traffic diverted onto the northbound carriageway in a contraflow traffic management system.  The walkway will remain open.  All loads above 2.6m will be restricted from using the crossing.  A 30mph speed limit will be in place.

  • Tulloch Crescent

    closed to pedestrians (road has no vehicular access) until 8 September for works associated with a new housing development.

  • Rose Lane

    closed to pedestrians (between Rosebank Road and Arthur Street) until 8 September for ongoing housing development works.

  • Scottish and Southern Energy Network Constable Street Cable Renewal Scheme

    rolling road closures from Monday 15 January for 20 weeks:

     

    • Park Avenue (Morgan Street to Albert Street) – closed for 2 weeks;

     

    • McGill Street – closed for one week; and

     

    • Albert Street (Victoria Street to Balmore Street) – closed northbound from Monday 20 May for 6 weeks.
  • Gourdie Place (Gourdie Crescent to church car park)

    closed from Monday 20 May for one week for installation of services to new housing development.

  • Mary Ann Lane

    closed at north end until Friday 19 July for redevelopment of car hire business.  Access/egress for residents of former DP&L Shipping building maintained from south end.

  • A930 Monifieth Road (at Panmure Street)

    road closures and temporary traffic lights from Monday 20 May for 3 weeks for junction improvement works:

     

    • Panmure Street (south of A930 Monifieth Road to railway underpass) - closed with controlled vehicular access;

     

    • Panmure Street (north of A930 Monifieth Road for a distance of 20m) – closed;

     

    • A930 Monifieth Road (at Panmure Street) – temporary traffic lights;

     

    • A930 Monifieth Road (at Panmure Street) – closed on Saturday 25 and Sunday 26 May; and

     

    • A930 Monifieth Road (at Panmure Street) – closed on Saturday 1 and Sunday 2 June (provisional dates).
  • Camperdown Street, Lochee (from Burnside Street for approximately 50 metres)

    closed until Tuesday 21 May for service connections to new development.

  • Baldovie Road (Balunie Avenue to Balunie Drive)

    road closure from Monday 20 May for 3 weeks for pedestrian crossing upgrade works.

  • Doon Terrace (at Pitkerro Road)

    temporary traffic lights from Thursday 16 May for 2 weeks for water connection works.

  • Fountainbleau Drive

    off‑peak stop-go from Monday 20 May for 3 days for lining works.

  • Pitcairn Road and Pitlessie Gardens

    closed Monday 20 May for 5 days for Category 4 Patching.

  • Gourdie Brae

    temporary traffic lights from Monday 20 May for 5 days for pothole and gully repairs.

  • Queen Street (at Fort Street)

    nearside westbound lane for one week for Virgin Media work.

  • Loons Road (at Lawside Road)

    temporary traffic lights from Wednesday 22 May for one week for Scottish and Southern Energy Network work.

  • Greenmarket (at junction to train station cul-de-sac)

    prohibition of right turn manoeuvres from Wednesday 22 May for 5 working days for BT work.

  • A92 East Dock Street

    overnight (7.30pm to 5.30am) northbound lane closure on Friday 24 May for carriageway patching.

Forthcoming

  • Hill Street (Strathmartine Road to Hill Square)

    closed Monday 27 May for 9 days for Scottish Water work.

  • Gourdie Brae

    temporary traffic lights from Monday 27 May 2024 for 2 days for boundary wall repairs at Camperdown Park South.

  • Gourdie Brae/Old Liff Road and Myrekirk Road

    temporary traffic lights from Wednesday 29 May for 3 days for manhole repairs.

  • Provost Road (Clepington Road to Fleming Gardens West)

    closed southbound on Thursday 30 and Friday 31 May for Hyperoptic work

  • Magdalen Yard Road (between Thomson Street and Windsor Street)

    closed to westbound traffic on Sunday 2 June for Westfest event.

  • A930 Dalhousie Road (Bridge Street to Guthrie Terrace)

    road closures and temporary traffic lights from Monday 3 June for 10 weeks for junction improvement works:

     

    • Bridge Street (at junction of A930 Dalhousie Road) - closed;

     

    • A930 Dalhousie Road (Bridge Street to Guthrie Terrace) – temporary traffic lights;

     

    • Collingwood Street and Collingwood Crescent – closed periodically between Monday 3 June and Friday 16 August;

     

    • A930 Dalhousie Road (Bridge Street to Guthrie Terrace) – closed Saturday 10 and Sunday 11 August; and

     

    • A930 Dalhousie Road (Bridge Street to Guthrie Terrace) – closed Saturday 17 and Sunday 18 August (provisional dates).
  • Glamis Drive (Hillside Road to Glamis Road)

    closed from Monday 3 June for 5 days for Drainage Improvement works.

  • Meadowside (at Reform Street)

    temporary traffic lights from Monday 3 June for one week for BT work.

  • Traill Street (Forthill Road to Cedar Road)

    closed Saturday 8 June for BT work.

  • Forthill Road (at Traill Street)

    temporary traffic lights Saturday 8 June for BT work.

  • Dens Road (Mains Road to Isla Street)

    closed from Monday 10 June for 2 weeks for Scottish Water work.

  • Hebrides Drive (North leg of Foula Terrace to Barra Terrace)

    closed Monday to Friday, from Monday 10 June for 2 weeks for drainage connections to new housing development.

  • Scottish and Southern Energy Network Elmwood Cable Renewal Scheme

    rolling road closures from Monday 17 June for 29 weeks:

     

    • Elmwood Road (Charleston Drive to Sutherland Place);

     

    • Charleston Drive (eastbound between Elmwood Road and Glamis Road);

     

    • Ancrum Road (westbound between Tullideph Road and Glamis Road);

     

    • Tullideph Road (westbound between City Road and Ancrum Road);

     

    • City Road (southbound between Tullideph Road and Milnbank Gardens); and

     

    • Milnbank Gardens.

     

  • Riverside Avenue/Dykes of Gray Road (at Swallow roundabout)

    closed Monday to Friday overnight (7.30pm to 6.30am) from Monday 1 July for 11 months for junction improvement works.

 


Roads - General

Planned road closures and restrictions are necessary to allow for a variety of maintenance work including resurfacing and reconstruction as well as water, sewer, electricity, gas and telecom supply/renewal/maintenance works, etc.

It may be that the Dundee City Council is not responsible for these works.  However we have a duty to inform the public of any major situation which may arise – planned or otherwise – that may affect their ability to move about the city.  We have included here a listing of road closures and major lane closures or restrictions and the contact numbers for the main utility companies in case you have a query on any specific set of roadworks.

Please note the information provided is current as of the Friday prior to the report date and is subject to change at any time.  Any updates after publication on Fridays are indicated in bold.

For further information about this road report e-mail rmp@dundeecity.gov.uk.  For specific information please phone any of the telephone numbers given below.

Trunk Roads are not the responsibility of the Council but are presently maintained by Amey Transport Infrastructure on behalf of the Scottish Government's Transport Scotland.  Trunk Roads in Dundee consist of:

A90 Kingsway West/Kingsway/Forfar Road (north of Kingsway)
A972 Kingsway East
A92 Greendykes Road / Broughty Ferry Road (at Carolina House)/ East Dock Street/South Marketgait (to Trades Lane)

Amey Transport Infrastructure - Customer Services

0800 083 0084
British Telecom (Openreach) 0800 023 2023
Scottish & Southern Energy (Scottish Hydro Electric) 0800 300 999
Scottish Water 0800 0778 778
Virgin Media (NTL/Telewest) 0333 0005 925
Scotland Gas Networks 0845 605 6677
Vodafone (C&W Thus) 0333 304 0762
Fibrecity Dundee 0800 954 2020

Clarence - to report road, pavement & lighting defects

or

Customer Care Line (mobiles & calls outwith Dundee)

0800 232323

or

01382 433063


The position of on-going or planned roadworks, anywhere in Scotland, can be accessed on line by clicking on the following link:

Scottish Roadworks Register


The roadworks contained in this report are restricted to major works executed on the roads maintained either by the local Roads Authority, Transport Scotland or the Tay Road Bridge Board. Details on the roads maintained by these organisations can be viewed by clicking on the following link:

List of Public Roads

Discover Dundee Waterfront