Road Report

Saturday 16 and Sunday 17 January 2021

  • Milton of Craigie Road North

    closed at junction with Longtown Road for one week for gas main repair.

  • Dykes of Gray Road

    temporary traffic lights from Wednesday 13 January for one week for gas main repair.

  • North Marketgait (Victoria Way to Constitution Road)

    westbound lane closure on Sunday 17 January for building inspection works.

Report for Week Commencing Monday 18 January 2021

  • South Castle Street (Riverside Esplanade to Blackwatch Parade)

    closed for 3 months for urban beach development works.

  • Douglas Terrace from Dundee Road to Home Street (Section 1), Douglas Terrace from Home Street to Westfield Road (Section 2), James Place from Westfield Road to Church Street (Section 3), Fisher Street from Church Street to Fort Street (Section 4) and Fisher Street from Fort Street to Ambrose Street (Section 5)

    closed in phases as described for 11 months for Flood Prevention Works.  No more than 2 sections may be closed at the same time.

  • South Ward Road (North Lindsay Street to Argyllgait)

    closed for 6 weeks for building refurbishment works.

  • Hawkhill

    traffic control for up to 2 weeks for street lighting column removals.

  • Candle Lane (Allan Lane to Dock Street)

    closed for 17 weeks for crane lifting works for a new housing development.

  • The Esplanade, Broughty Ferry - (1) from a point 110 metres or thereby from the junction with Bridge Street for a distance of 400 metres or thereby in a westerly direction, (2) westbound from Panmure Street to Brook Street and (3) from Brook Street to Castle Lane

    closed to vehicular traffic from Tuesday 5 January to provide physical distance measures for higher levels of pedestrians and cyclists.  This closure is expected to be in force for 12 months.

  • Wentworth Avenue Area

    rolling road closures for 3 weeks for City Fibre cable installation work.  Streets affected are:  Troon Crescent, Troon Gardens, Troon Terrace, Wentworth Avenue, Wentworth Drive, Wentworth Gardens, Wentworth Lane and Wentworth Place.

  • Lauderdale Avenue Area

    rolling road closures for one week for City Fibre cable installation work.  Streets affected are:  Cloan Road and Haldane Street.

  • Charleston Area

    rolling road closure programme from for 3 weeks for City Fibre cable installation work.  Streets affected are:  Dunholm Road and Duncraig Road.

  • Ardler Area 1:

    rolling road closures for 3 weeks for City Fibre cable installation work.  Streets affected are:  East Scotscraig Lane, Scotscraig Road, Scotscraig Street and Troon Place.

  • Ardler Area 2

    rolling road closures for 3 weeks for City Fibre cable installation work.  Streets affected are:  Gleneagles Lane, Gleneagles Road, Gleneagles Street, St Fillans Place and St Fillans Road.

  • Strathmartine Road (Gillburn Road to Balgowan Avenue)

    temporary traffic lights for 2 weeks for City Fibre works.

  • Kemnay Place (between Douglas Road and Kemnay Gardens)

    closed until Tuesday 19 January for Scottish Water mains repair works.

  • U328 Liff Hospital Road

    temporary traffic lights for 2 weeks for gas service connections.

  • Dalhousie Road (at Guthrie Terrace)

    temporary traffic lights for one week for Scottish Water work.

  • A923 Coupar Angus Road at Landsdowne Gardens

    lane closures from Monday 18 January for 5 days with temp lights for pedestrian crossing refurbishment.

  • Douglas Road (Balunie Drive to Ballindean Road including roundabout at Balunie Drive)

    closed from Tuesday 19 January for 5 working days for carriageway resurfacing works.

  • St Vincent Street (between Queen Street and Brook Street), Broughty Ferry

    closed overnight (10.00pm to 6.00am) on Saturday 23 January for Network Rail Inspection Works.

  • Rankine Street

    closed from Saturday 23 January for 3 days for water connection works.

Forthcoming

  • Mallaig Avenue (between Spey Drive and Canisp Crescent), Ullapool Crescent (entire length) and Thurso Crescent (between Spey Drive and Charleston Drive)

    closed from Monday 25 January for 5 working days for City Fibre duct installation works.

  • Erskine Lane (from its junction with Brook Street to approx. 30 metres north), Broughty Ferry

    closed from Monday 25 January for 2 days for Openreach repair works.

  • Dundee Road (Victoria Road to Ellieslea Road)

    rolling temporary traffic lights from Monday 25 January for 8 weeks for SGN work.

  • Arbroath Road (at Albert Street)

    temporary traffic lights Wednesday 27 January for one week for Scottish Water work.

  • Strawberrybank

    closed on Thursday 28 January for Scottish Water mains repair works.

  • St Fillans Place (between St Fillans Road and Macalpine Road), St Fillans Road (between St Fillans Place and Macalpine Road) and St Kilda Road (between St Ninians Terrace and St Kilda Place)

    closed on Thursday 28 January for Scottish Water investigation works.

  • Brantwood Avenue (from Alpin Road to Harlow Place)

    closed from Monday 1 February for 5 days for pedestrian crossing upgrade works.

  • Strips of Craigie Road

    closed from Tuesday 2 February for 4 days for pre-surface dressing patching works.

  • Mansion Drive

    closed from Monday 8 February for 8 days for carriageway resurfacing works.

  • A991 West Marketgait (Hawkhill to Guthrie Street)

    northbound nearside lane closure on Monday 8 February for roof inspection works.

  • Clepington Road (Old Glamis Road to Mains Loan)

    closed from Monday 8 February for 2 weeks for pedestrian crossing refurbishment works.

Road Report container

Road Report content

 


Roads - General

Planned road closures and restrictions are necessary to allow for a variety of maintenance work including resurfacing and reconstruction as well as water, sewer, electricity, gas and telecom supply/renewal/maintenance works, etc.

It may be that the Dundee City Council is not responsible for these works.  However we have a duty to inform the public of any major situation which may arise – planned or otherwise – that may affect their ability to move about the city.  We have included here a listing of road closures and major lane closures or restrictions and the contact numbers for the main utility companies in case you have a query on any specific set of roadworks.

Please note the information provided is current as of the Friday prior to the report date and is subject to change at any time.  Any updates after publication on Fridays are indicated in bold.

For further information about this road report call Dundee City Council 0800 232323 or e-mail roadworks@dundeecity.gov.uk.  For specific information please phone any of the telephone numbers given below.

Trunk Roads are not the responsibility of the Council but are presently maintained by BEAR Scotland Ltd on behalf of the Scottish Government's Transport Scotland.  Trunk Roads in Dundee consist of:

A90 Kingsway West/Kingsway/Forfar Road (north of Kingsway)
A972 Kingsway East
A92 Greendykes Road / Broughty Ferry Road (at Carolina House)/ East Dock Street/South Marketgait (to Trades Lane)

BEAR Scotland, Customer Care Number 0800 028 1414
British Telecom (Openreach) 0800 023 2023
Scottish & Southern Energy (Scottish Hydro Electric) 0800 300 999
Scottish Water 0800 0778 778
Virgin Media (NTL/Telewest) 0333 0005 925
Scotland Gas Networks 0845 605 6677
Vodafone (C&W Thus) 0333 304 0762
Fibrecity Dundee 0800 954 2020

Clarence - to report road, pavement & lighting defects

or

Customer Care Line (mobiles & calls outwith Dundee)

0800 232323

or

01382 433063


The position of on-going or planned roadworks, anywhere in Scotland, can be accessed on line by clicking on the following link:

Scottish Roadworks Register


The roadworks contained in this report are restricted to major works executed on the roads maintained either by the local Roads Authority, Transport Scotland or the Tay Road Bridge Board. Details on the roads maintained by these organisations can be viewed by clicking on the following link:

List of Public Roads

Discover Dundee Waterfront