Tay Road Bridge

Location

Tay Road Bridge

Details

Dundee ramps resurfacing and joint replacement works:

 

  • Tuesday 3 September – bridge closed for 4 nights from 12.20am to 5.00am; and

 

  • Tuesday 10 September – bridge closed for one night from 12.20am to 5.00am.

 

Outwith the above closure dates there will be local diversions in place around the Dundee ramps from 7.00pm to 5.00am.